Metal Structure Mezzanine · 11.10 × 5.88 m · 65 m²
Outside Spain and Portugal: by quotation only, with tailored transport.
Initializing technical configurator...
Image gallery · Metal Structure Mezzanine

Description · Metal Structure Mezzanine
Expand your space intelligently with a metal structure mezzanine, ideal for doubling the usable area of your business or warehouse. This system, measuring 11.10 x 5.88 meters and covering 65 m², allows you to optimize the organization and storage of merchandise. Its main advantage is the load capacity of 500 kg/m², ensuring solidity and safety for your products. The structure, composed of beams and columns in blue and orange finishes, is easily assembled in a bolted manner, adapting to your specific needs.
Applicable regulations in Ireland · Metal Structure Mezzanine · 11.10 × 5.88 m · 65 m²
Mezzanine floors (building work and fixed installation)
In Ireland, a mezzanine floor is building work: a material alteration under the Building Control Act 1990 and the Building Regulations 1997 (art. 11 and Parts A, B and K of the Second Schedule). Under the Building Control Regulations 1997 a Commencement Notice goes to the building control authority 14 to 28 days before work starts (art. 8); a mezzanine adding floor area inside an existing shop, office, industrial or storage building needs a Fire Safety Certificate (art. 11(1)(c)), and with it the Assigned Certifier regime and a Certificate of Compliance on Completion before use (arts. 9 and 20F). Internal works are usually exempted development (Planning and Development Act 2000, s. 4(1)(h)).
A competent designer calculates the structure to the Eurocodes (I.S. EN 1990, 1991 and 1993) with their Irish National Annexes; permanently incorporated structural steel components are construction products under the EU Construction Products Regulation (EU) 2024/3110, with a declaration and CE marking (art. 17); the execution standard for steel structures is EN 1090.
In use it is a workplace under the General Application Regulations 2007: adequate solidity (Reg. 5), clear emergency routes (Reg. 12), a written risk assessment (2005 Act, s. 19) and, at any open edge, suitable and sufficient edge protection (Regs. 99 and 103). Technical Guidance Document B, the official guidance to Part B, expects fire-resisting structure for a raised storage area in an industrial or storage building unless it is one tier with few people and no public, a stair within 3 m of an exit, fire detection and no side over 20 m.
Recommendation: get signed calculations before ordering, confirm notice and certificate with the building control authority, fix a load notice per level, guard every edge and never exceed the design load.
Guidance based on current regulations; it does not replace the legal text or professional advice. · Last checked: 2026-09-08







