Description · Industrial Mezzanine for Warehouse

The industrial intermediate floor is the ultimate solution to multiply the usable space of your business, installing an additional level of 108 m² with a robust metal structure and a load capacity of 500 kg/m². This system, measuring 18.43 × 5.88 m, allows for optimization of merchandise distribution and storage, and even adaptation of spaces with structural columns through a personalized technical study. The industrial intermediate floor, with a blue and orange finish, is easily assembled and ready to transform your warehouse.

Applicable regulations in Ireland · Industrial Mezzanine for Warehouse · 18.43 × 5.88 m · 108 m²

Mezzanine floors (building work and fixed installation)

In Ireland, a mezzanine floor is building work: a material alteration under the Building Control Act 1990 and the Building Regulations 1997 (art. 11 and Parts A, B and K of the Second Schedule). Under the Building Control Regulations 1997 a Commencement Notice goes to the building control authority 14 to 28 days before work starts (art. 8); a mezzanine adding floor area inside an existing shop, office, industrial or storage building needs a Fire Safety Certificate (art. 11(1)(c)), and with it the Assigned Certifier regime and a Certificate of Compliance on Completion before use (arts. 9 and 20F). Internal works are usually exempted development (Planning and Development Act 2000, s. 4(1)(h)).

A competent designer calculates the structure to the Eurocodes (I.S. EN 1990, 1991 and 1993) with their Irish National Annexes; permanently incorporated structural steel components are construction products under the EU Construction Products Regulation (EU) 2024/3110, with a declaration and CE marking (art. 17); the execution standard for steel structures is EN 1090.

In use it is a workplace under the General Application Regulations 2007: adequate solidity (Reg. 5), clear emergency routes (Reg. 12), a written risk assessment (2005 Act, s. 19) and, at any open edge, suitable and sufficient edge protection (Regs. 99 and 103). Technical Guidance Document B, the official guidance to Part B, expects fire-resisting structure for a raised storage area in an industrial or storage building unless it is one tier with few people and no public, a stair within 3 m of an exit, fire detection and no side over 20 m.

Recommendation: get signed calculations before ordering, confirm notice and certificate with the building control authority, fix a load notice per level, guard every edge and never exceed the design load.