Racks Point Logo

Industrial Metal Mezzanine · 7.44 x 5.88 m · 44 m²

Outside Spain and Portugal: by quotation only, with tailored transport.

Initializing technical configurator...

Description · Industrial Metal Mezzanine

Installing a heavy-duty metal mezzanine measuring 7.44 x 5.88 metres instantly grants 44 m² of extra floor space across a single platform at a 2.48 m height. Built with a 2 x 2 bay configuration and standing 368 cm tall, this blue and orange steel structure delivers a 500 kg/m² load capacity for safely storing heavy stock or setting up new work areas. Complete with an integrated perimeter handrail and access staircase, this 1770.30 kg bolted kit optimises high vertical space without complex building works.

Adding a heavy-duty metal mezzanine to your industrial premises unlocks a single raised floor tier designed to hold up to 500 kg/m² in uniformly distributed weight across 44 square metres. Commercial managers in Ireland can systematically store heavy merchandise, oversized goods, and packed cartons high above the main floor. Expanding your usable working footprint vertically prevents operational bottlenecks, keeps inventory organised, and ensures full structural stability across the entire platform without requiring costly building extensions or permanent structural renovations.

Measuring 368 cm in total height, 744 cm in overall width, and 588 cm in depth, this elevated metal mezzanine structure sets its main floor platform at a comfortable 2.48 metres above the ground. Such precise dimensions create vast overhead clearance suitable for housing archive boxes, machine components, spare parts, and boxed inventory. Positioning items on this elevated deck clears prime ground-floor real estate, making daily stock handling smoother while maintaining easy access to essential commercial equipment throughout your busy facility.

Engineered from high-resistance steel beams and upright columns, this industrial metal mezzanine is configured with a 2 × 2 bay layout measuring 3.55 by 2.80 metres per section. Safety is guaranteed by an integrated perimeter handrail and secure access stairs for daily staff transit. The entire system features a straightforward bolted assembly process, allowing internal warehouse teams to construct the strong framework efficiently using basic site tools, avoiding operational downtime during setup.

Coated in an iconic blue and orange protective finish, this robust metal mezzanine platform shields steel components against daily wear, abrasion, and environmental corrosion in active workspaces. Weighing 1770.30 kg in total kit weight, the platform delivers unyielding floor stability. For facilities requiring alternative footprints, our broader modular range offers diverse standard dimensions and structural configurations, providing tailored vertical storage answers across diverse Irish industrial and commercial environments.

Selecting this spacious configuration is the definitive upgrade for busy commercial warehouses, automotive workshops, and bustling retail stockrooms needing superior footprint coverage compared to smaller options. This wide structure doubles available operational room without requiring major facility alterations. Whether organizing replenishment stock or creating segregated assembly areas, implementing a heavy-duty metal mezzanine ensures long-term operational flexibility, enhanced safety, and exceptional workflow efficiency for growing Irish enterprises.

This closed kit is specifically engineered for open-plan premises requiring a completely clear floor area without structural building columns. Supplied without standard installation services or bespoke technical surveys, the pre-configured framework allows internal staff to complete assembly directly using the supplied technical instructions. Integrating a metal mezzanine into an unobstructed site ensures predictable spatial planning across its fixed 2 x 2 bay distribution of 3.55 x 2.80 m sections.

Operating as a single elevated platform at 2.48 m high, this robust metal mezzanine separates daily operational transit on the ground from overhead stock management. The upper deck safely accommodates heavy merchandise, bulk cartons, machine components, and spare parts up to 500 kg/m² in distributed weight. Meanwhile, keeping the lower 44 m² floor open simplifies forklift routes, order picking, and general goods handling across your Irish commercial facility.

Frequently asked questions · Industrial Metal Mezzanine

What surface area and overall dimensions does this metal mezzanine offer?
This model provides 44 square metres of additional floor space with an overall height of 368 cm, a width of 744 cm, and a depth of 588 cm. The raised floor platform sits at 2.48 metres high, doubling your usable warehouse space.
How much weight can a metal mezzanine of this size support?
The heavy-duty steel structure supports up to 500 kg per square metre of evenly distributed load across its single elevated level. That makes this kit ideal for safely storing heavy merchandise, pallets, cardboard boxes, or setting up extra staff work areas.
What safety components come included with these metal mezzanines?
The complete kit comes equipped with integrated perimeter handrails and an access staircase for safe access. The frame is organized into 2 by 2 bays measuring 3.55 by 2.80 metres, ensuring complete structural firmness and stability under daily commercial use.
How is the assembly handled for this structure?
The kit features a fully bolted assembly process, allowing your warehouse team to erect the unit without requiring complex building works. The overall package weighs 1770.30 kg, supplying a robust steel solution designed to maximize your vertical building volume directly.
What finish and colors are applied to this kit?
The steel components feature a protective finish in blue and orange colors. This durable coating shields the frame against routine wear and tear in active industrial settings, maintaining a clean look across your shop floor or storage space.
How does this model compare to smaller elevated platforms?
Measuring over seven metres wide by almost six metres deep, this 44 m² platform provides significantly more usable floor area than narrower alternatives. It gives your business a dedicated, high-capacity upper floor for inventory, archive storage, or order preparation routines.

Applicable regulations in Ireland · Industrial Metal Mezzanine · 7.44 x 5.88 m · 44 m²

Mezzanine floors (building work and fixed installation)

In Ireland, a mezzanine floor is building work: a material alteration under the Building Control Act 1990 and the Building Regulations 1997 (art. 11 and Parts A, B and K of the Second Schedule). Under the Building Control Regulations 1997 a Commencement Notice goes to the building control authority 14 to 28 days before work starts (art. 8); a mezzanine adding floor area inside an existing shop, office, industrial or storage building needs a Fire Safety Certificate (art. 11(1)(c)), and with it the Assigned Certifier regime and a Certificate of Compliance on Completion before use (arts. 9 and 20F). Internal works are usually exempted development (Planning and Development Act 2000, s. 4(1)(h)).

A competent designer calculates the structure to the Eurocodes (I.S. EN 1990, 1991 and 1993) with their Irish National Annexes; permanently incorporated structural steel components are construction products under the EU Construction Products Regulation (EU) 2024/3110, with a declaration and CE marking (art. 17); the execution standard for steel structures is EN 1090.

In use it is a workplace under the General Application Regulations 2007: adequate solidity (Reg. 5), clear emergency routes (Reg. 12), a written risk assessment (2005 Act, s. 19) and, at any open edge, suitable and sufficient edge protection (Regs. 99 and 103). Technical Guidance Document B, the official guidance to Part B, expects fire-resisting structure for a raised storage area in an industrial or storage building unless it is one tier with few people and no public, a stair within 3 m of an exit, fire detection and no side over 20 m.

Recommendation: get signed calculations before ordering, confirm notice and certificate with the building control authority, fix a load notice per level, guard every edge and never exceed the design load.

Guidance based on current regulations; it does not replace the legal text or professional advice. · Last checked: 2026-09-08