Industrial Mezzanine Floors in Ireland
Double your usable space by taking advantage of the height. Choose one of our 10 enclosed mezzanine kits (from 11 to 108 m²), buy it online with its price, and receive it on a pallet; or design it in 3D and request a quote if you need a different size.
Design your mezzanine and calculate its price
Choose your mezzanine: 10 enclosed kits
Spans of 3.55 × 2.80 m, floor at 2.48 m, galvanized sheet metal floor for 500 kg/m², perimeter railing, and stairs. Choose the size, buy it online, and receive it on a pallet; or design it above in 3D.
Why a metal mezzanine?
More space without construction
Create a second floor by taking advantage of the free height of your warehouse (from 4.5 m) without extensions or major building permits.
Custom-made for you
Modular steel structure with spans of 3.55 × 2.80 m, floor at 2.48 m, and 500 kg/m². Perimeter railing and stairs included.
Multi-purpose
Picking warehouse, archive, elevated offices, or production area. Galvanized sheet metal floor.
Removable and relocatable
Bolted connections: easily expanded or moved if your needs change.
How it works
Configure it in 3D
Surface area, number of spans, and type of use.
Fixed price
The kit you configure has its price: you see it instantly.
Buy it online
Add it to your cart and pay like any other product; or request a quote if you need it custom-made.
You receive it on a pallet
Made to order: we will confirm the lead time upon receiving your order. Bolted assembly, with instructions.
Ready to expand your warehouse?
Choose your kit or design your mezzanine above. You can also request a custom quote from us.
Design my mezzanineApplicable regulations in Ireland · Mezzanine Floor Kits
Mezzanine floors (building work and fixed installation)
In Ireland, a mezzanine floor is building work: a material alteration under the Building Control Act 1990 and the Building Regulations 1997 (art. 11 and Parts A, B and K of the Second Schedule). Under the Building Control Regulations 1997 a Commencement Notice goes to the building control authority 14 to 28 days before work starts (art. 8); a mezzanine adding floor area inside an existing shop, office, industrial or storage building needs a Fire Safety Certificate (art. 11(1)(c)), and with it the Assigned Certifier regime and a Certificate of Compliance on Completion before use (arts. 9 and 20F). Internal works are usually exempted development (Planning and Development Act 2000, s. 4(1)(h)).
A competent designer calculates the structure to the Eurocodes (I.S. EN 1990, 1991 and 1993) with their Irish National Annexes; permanently incorporated structural steel components are construction products under the EU Construction Products Regulation (EU) 2024/3110, with a declaration and CE marking (art. 17); the execution standard for steel structures is EN 1090.
In use it is a workplace under the General Application Regulations 2007: adequate solidity (Reg. 5), clear emergency routes (Reg. 12), a written risk assessment (2005 Act, s. 19) and, at any open edge, suitable and sufficient edge protection (Regs. 99 and 103). Technical Guidance Document B, the official guidance to Part B, expects fire-resisting structure for a raised storage area in an industrial or storage building unless it is one tier with few people and no public, a stair within 3 m of an exit, fire detection and no side over 20 m.
Recommendation: get signed calculations before ordering, confirm notice and certificate with the building control authority, fix a load notice per level, guard every edge and never exceed the design load.
Guidance based on current regulations; it does not replace the legal text or professional advice. · Last checked: 2026-09-08









