Mezzanine Unit · 14.76 x 5.88 m · 87 m²
Outside Spain and Portugal: by quotation only, with tailored transport.
Initializing technical configurator...
Image gallery · Mezzanine Unit

Description · Mezzanine Unit
Maximise your facility footprint with this 14.76 x 5.88 m mezzanine unit, engineered to unlock 87 m² of elevated operational surface. Constructed with a 4 x 2 bay layout reaching a total height of 368 cm, this blue and orange bolted steel platform delivers a 500 kg/m² load capacity across its 2.48 m deck level. Weighing 3248.30 kg, this complete kit features a perimeter handrail and access staircase to optimise industrial storage.
Investing in a heavy-duty mezzanine unit provides your business with 1 broad elevated level engineered to sustain a distributed load of 500 kg per square metre across its expansive surface. This high weight allowance allows operations to securely store large volumes of archive boxes, heavy machinery components, and dense stock crates overhead. By concentrating substantial payloads onto a single sturdy upper deck, Irish commercial facilities maximise usable vertical headroom without structural building works, maintaining an uncluttered ground floor for daily logistics tasks.
Engineered for strength and durability, every structural component in this mezzanine unit contributes to a total unit weight of 3248.30 kg. The complete set includes robust upright columns, primary beams, floor decking, cross bracing, a perimeter safety handrail, and an integrated access staircase. The entire framework utilizes a bolted assembly system, enabling your internal maintenance staff to erect the platform safely without requiring disruptive building works or permanent site alterations, ensuring full operational stability across your facility.
Featuring a high-visibility blue and orange finish, this heavy-duty mezzanine unit combines structural steel protection against corrosion with clear visual demarcation for active work zones. The distinctive paint coating shields steel members against daily wear while creating a bright, professional appearance. Should your floor layout require alternative dimensions or configurations, our broader storage range includes smaller and medium-sized platforms, allowing businesses across Ireland to select the ideal footprint for their precise room layout and operational needs.
Compared to compact storage platforms in our collection, choosing this expansive 87 m² mezzanine unit is the definitive choice for large logistics centres, busy distribution hubs, and major industrial workshops. Where smaller mezzanine units reach capacity limits, this broad structure provides the necessary surface area to clear ground floor congestion, centralise heavy stock, and store massive parcel inventory overhead, optimizing overall workflow efficiency throughout your facility for long-term productivity.
Delivered as a fixed pre-engineered kit, this mezzanine unit features fixed dimensions of 14.76 by 5.88 m designed to fit open commercial layouts without adapting to site pillars or structural columns. Supply does not include on-site assembly, technical surveys, or installation services, allowing internal maintenance teams to complete construction directly from the included instructions. Businesses requiring custom footprints or bespoke alterations to fit around building obstructions can contact our team for tailored quotations.
Operating as a single wide-span elevated platform, the structure is designed to support 500 kg per square metre across its 87 m² surface area. Transporting heavy tools, dense archive storage, bulky parcel consignments, and spare parts onto the upper platform keeps active ground aisles clear for daily forklift traffic. Every complete mezzanine unit arrives ready for setup, equipped with an integrated access staircase and a perimeter safety handrail to secure high-elevation operations across Irish facilities.
Frequently asked questions · Mezzanine Unit
What is the load capacity of the industrial warehouse mezzanine floor?
What are the dimensions and surface area of this industrial warehouse mezzanine?
How is the industrial warehouse mezzanine assembled?
What finish and colors does the industrial warehouse mezzanine come in?
Are the height and number of levels of this structure fixed?
What elements are included in the supplied set?
How does this model differ within the available range?
Applicable regulations in Ireland · Mezzanine Unit · 14.76 x 5.88 m · 87 m²
Mezzanine floors (building work and fixed installation)
In Ireland, a mezzanine floor is building work: a material alteration under the Building Control Act 1990 and the Building Regulations 1997 (art. 11 and Parts A, B and K of the Second Schedule). Under the Building Control Regulations 1997 a Commencement Notice goes to the building control authority 14 to 28 days before work starts (art. 8); a mezzanine adding floor area inside an existing shop, office, industrial or storage building needs a Fire Safety Certificate (art. 11(1)(c)), and with it the Assigned Certifier regime and a Certificate of Compliance on Completion before use (arts. 9 and 20F). Internal works are usually exempted development (Planning and Development Act 2000, s. 4(1)(h)).
A competent designer calculates the structure to the Eurocodes (I.S. EN 1990, 1991 and 1993) with their Irish National Annexes; permanently incorporated structural steel components are construction products under the EU Construction Products Regulation (EU) 2024/3110, with a declaration and CE marking (art. 17); the execution standard for steel structures is EN 1090.
In use it is a workplace under the General Application Regulations 2007: adequate solidity (Reg. 5), clear emergency routes (Reg. 12), a written risk assessment (2005 Act, s. 19) and, at any open edge, suitable and sufficient edge protection (Regs. 99 and 103). Technical Guidance Document B, the official guidance to Part B, expects fire-resisting structure for a raised storage area in an industrial or storage building unless it is one tier with few people and no public, a stair within 3 m of an exit, fire detection and no side over 20 m.
Recommendation: get signed calculations before ordering, confirm notice and certificate with the building control authority, fix a load notice per level, guard every edge and never exceed the design load.
Guidance based on current regulations; it does not replace the legal text or professional advice. · Last checked: 2026-09-08







